Water people with a bare backyard
As self-described water people, Mark and Dawn looked at that empty Lakeville backyard and saw the perfect spot for an inground pool. After interviewing several pool designers, they chose Joe at Plan Pools by far, drawn to the integrity of the product and the way this pool was designed and built.
Why they chose an insulated concrete pool
What won them over was the construction: a concrete pool with a vinyl liner, built for the efficiency that mattered most to them. Heating performance was a top priority, and as they put it, it has more than delivered.
Just as important was working with Joe, who was no-nonsense and straightforward, with none of the high-pressure sales they had felt elsewhere. The price was very good, his estimate was spot on, and they knew exactly what they were getting every step of the way.
- 1Outer foamInsulates the wall against cold Minnesota ground.
- 2Steel rebar + solid concretePoured in place for a rigid wall with no rust or corrosion.
- 3Inner foamA second layer of insulation, right against your water.
- 4Vinyl linerA smooth finish over the concrete, sealed to the water.
- 5Coping and deckTied into a solid concrete wall, for decks that won’t heave.

That's the wall going up on a Plan Pools build, before the concrete is poured. Double insulation is why the water stays warm for less.
How ICF works →From a pool to a full backyard
Right away, Joe asked about their landscape plan, something Mark and Dawn had not even considered. Through Joe's connection with Neil's Outdoor, the pool project grew into a complete backyard.
Mark's idea for a fire pit, which Dawn worried would not fit, became a reality. They also wanted to avoid stairs running all the way down into the yard, so Joe designed a set that comes down halfway, finished with natural stone.
Every piece was something they shaped together with Joe.
A 3D design and a smooth build
Plan Pools started with a 3D rendering so Mark and Dawn could see their pool before it was built. Once Neil's Outdoor joined the conversation, the two teams tied the whole design together.
The crew showed up every day, explained what to expect, and cleaned up everything at the end of each day. All said and done, the pool was in within less than a week.
- 3D rendering first
- Crew on site daily
- Clean-up every night
- Pool in under a week
Out back 99% of the time
Now the backyard is where this family lives. They have a lot of family over and use the pool constantly, making the most of Minnesota's short summers. They come home from work and get in, have dinner and get in, and freely admit they are obsessed with the pool.






